Sterling Heights, Michigan

Tile ContractorSterling Heights

We set tile in Sterling Heights homes every week. Showers, floors, backsplashes, and fireplace walls. Call us and you talk to the crew that will do the work in your house.

Man wipes down a finished curbless glass shower floor
Local tile work, start to finish

The tile contractor Sterling Heights homeowners keep calling back

Tile fails in slow motion. First the grout in the shower goes dark and soft. Then a corner crumbles. Water gets behind the wall, and by the time a homeowner calls a tile contractor, the damage has spread well past the tile itself. We see it all over Sterling Heights. A shower built in the nineteen seventies with no real waterproof layer behind the board. A kitchen floor that flexes because nobody checked the subfloor. A backsplash set so far out of level that the upper cabinets look crooked. None of that is the homeowner's fault. It is what happens when tile goes in fast and the prep gets skipped. We do the prep. It is slower, it costs us more hours on site, and it is the only reason a tile job lasts.

Our crew handles the full range of tile work inside the house. Shower Tile Installation is the biggest share of what we do, and Bathroom Tile Installation usually rides along with it. We also do Kitchen Backsplash Installation, Tile Flooring Installation through kitchens and mudrooms and entries, Fireplace Tile Installation on hearths and surrounds, and full Bathroom Remodeling when the room needs more than fresh tile. Large format tile is its own skill and we set plenty of it. If the old floor has to come out first, we handle that part too. One crew, start to finish. You are not left chasing three trades who each blame the other for the mess in the middle of your house.

Not every call is a whole room. A fair share of our week is tile removal and replacement in one spot. A cracked field tile by the tub. Six loose pieces on a landing where the floor never had enough support. A hearth that lost its face when a log rolled. We will match what is there when a match still exists, and we will tell you plainly when it does not, because a tile from two thousand nine is often out of production. In that case we look at options. Sometimes a clean break at a doorway makes more sense than chasing a color that no longer exists. Sometimes the honest answer is that the room is due. Either way you hear it from the tile contractor doing the work, not from a salesperson with a folder.

Sterling Heights is a city of brick ranches and colonials that went up fast when the plants were hiring. Plenty of those homes still have their first bathroom tile, four inch squares on the wall and a mud pan underneath. Some of it was built well. We take out old work that outlasted the stuff installed in the past ten years. Newer subdivisions north of Eighteen Mile bring a different set of problems, mostly big open plans where a floor has to run flat across a long span with no break. We work in both. A tile contractor who only knows new construction gets caught out by an old house, and one who only patches old work will not plan a wide open floor well. Our crew moves between the two every week, from the streets off Utica Road to the newer blocks up near Twenty Two Mile.

Here is where the money goes on a good tile job, and it is not the tile. It is the layer under it. Flat walls, a solid floor, real waterproofing in the wet areas, and the right mortar for the tile you picked. Porcelain, ceramic, and natural stone do not behave the same way. A big porcelain plank needs a different setting bed than a small glass mosaic on a backsplash. Stone can stain when the wrong mortar comes through the joint. We match those pieces on purpose, not by habit. When we look at a room, we walk it, measure it, and check the parts nobody ever photographs. That walk costs you nothing and it takes about half an hour.

Season matters here more than people expect. Winter in Macomb County brings salt, grit, and standing meltwater right through the front door. Entry tile and mudroom tile take that abuse for five months. Summer swings the other way, humid and warm, with a bath fan that never quite keeps up. Both extremes work on grout joints and on any spot where the waterproofing went in thin. That is why we ask how a room gets used before we set anything in it. A back door that four kids and a dog come through needs a tougher floor than a powder room off the hall. Any tile contractor can pick a pretty tile. Picking one that survives a Michigan February is a different question, and it is the one we would rather answer.

We also try to make the job livable. Tile work is loud and dusty, and it lands in the two rooms a family cannot skip. So we set expectations on day one. Which days the water is off. Where the saw sits, usually the garage or the driveway. How we get from the door to the room without tracking mortar down the hall. We cover the path in, and we clean at the end of each day rather than at the end of the job. If your kitchen is out of use for a stretch, we tell you which nights to plan on takeout. That is small stuff. It also tends to be what people remember a year later.

When you call, you reach a person who sets tile, not a script. Tell us the room, the rough size, and what bothers you about it now. We will tell you what the work involves, what order it goes in, and roughly how many days the room is out of service. If the job is not worth doing yet, we say that too. Some showers need a plumber first. Some floors need the subfloor sorted out before any tile talk makes sense. We would rather point you at the right trade than sell you a repair that fails by spring. That is the whole pitch. A tile contractor who answers the phone, shows up when we said, and treats the part you cannot see as carefully as the part you can.

Talk to a real person

One call starts it in Sterling Heights

Tell us what is going on and we will walk you through the options. Open .

(586) 250-4239
Free Quote

Request a callback today

We reply within 1 business hour. No spam, ever.

Why our work holds up

The parts of a tile job you will never see

Shower Tile Installation is the job we get called for most, and a shower is not really a tile job. It is a water job with tile on top. The part that keeps your walls dry sits behind everything you can see. We slope the pan so water runs to the drain instead of sitting in the corners. We waterproof the walls, the curb, and the seams where wall meets floor. Niches get the same care, because a niche is a hole in your shower wall and holes leak. Then we flood test. Plug the drain, fill the pan, and leave it sitting. If the level drops, we find out now, not after the tile is set and the wall is closed up. Any tile contractor can hang tile on a wall. The real test is what happens behind it in year six, when nobody is looking.

Floors move. Wood framing flexes when you walk on it, and tile does not flex at all. That fight is why so many kitchen floors in Macomb County have a cracked line running right down the traffic path. Before we start Tile Flooring Installation we check the subfloor. We look at the joist spacing, the span, and how much the floor gives under weight. If it needs another layer, we add one. If a basement slab has a low spot, we pour leveler and let it cure. Then we set an uncoupling membrane or a crack isolation layer where the room calls for it, so small movement in the wood does not travel straight into the grout. It costs an extra day. It is also the difference between a floor that stays quiet and one that starts cracking by the next winter.

Most people call a tile contractor for a shower and then add the kitchen once our crew is already in the house. Kitchen Backsplash Installation looks like the small job on the list. It is also the one you stare at every single day. The layout has to be right. We plan the field so cut tile lands where the eye does not go, and so outlets and switch plates land clean instead of splitting a tile down the middle. Under a range hood, the run has to line up with the hood and the cabinets at the same time, and those two are rarely square with each other. Around a window we hold the reveal even on both sides. We also handle the gap nobody thinks about, the one between the counter and the first course, which needs a soft flexible joint rather than hard grout. A backsplash set wrong is not a safety problem. It just nags at you forever.

Large format tile changed what a bathroom can look like. It also punishes a sloppy install. When a tile runs two feet long, a small hump in the wall shows up as a lip you can catch with a fingernail. So the wall gets flattened first. We back butter each piece so mortar covers the whole back and not just the ridges. Leveling clips hold the edges even while it sets. We plan the offset too, because a running bond at half the tile length will telegraph any warp built into the tile. A third of the way over is the safer pattern. These are small choices on their own. Stacked across a whole bathroom, they are the reason one job reads flat and calm while another reads busy and rough.

Grout is where most of the questions come from. Cement grout is porous, so it takes on soap film and dirt, and in a shower it needs sealing plus a rinse habit to stay light. Epoxy grout resists stains far better and is harder to work, which is why some crews steer around it. We will tell you straight which one suits your room. A mudroom floor by the garage door in a Sterling Heights winter is a different problem than a guest bath nobody uses. Salt, sand, and melted slush come in on boots from November through March. A darker grout and a tighter joint hold up better in that spot. In a bright bathroom, lighter grout keeps the room open. There is no single right answer, and a tile contractor who gives you one without seeing the room is guessing.

One request comes up every winter in this part of Macomb County. Warm floors. Electric mats under bathroom tile are a real comfort in a house where the bath sits over an unheated crawl space or on the cold side of the building. The mat goes down over the prepared floor, gets covered in mortar, and the tile sets on top. We test the circuit before the tile goes on and again after, because once a mat is buried, a break in it is a demo job. The thermostat needs a home in the wall too, so we plan that early with your electrician. It is not right for every room. In a small bath tiled in porcelain, on a February morning, people tell us it was the best part of the job.

Old tile has to come out before new tile goes in, and that part is dirtier than people expect. Thinset does not let go politely. We tape off the room, run a fan or air scrubber to a window, and protect the path from the work area to the door. In houses built before the early eighties, we slow down. Some old floor tile and the black mastic under it can hold asbestos, and the EPA is clear that the safe move is to test rather than assume. If a test is needed, we say so before anyone swings a hammer. Nobody gains from a surprise on demo day. Once the floor is clean and flat, new work goes in on a sound base instead of on top of somebody else's shortcut.

Two jobs tend to show up in the fall. One is the fireplace, because the first cold night reminds people that the brick surround has looked tired since they moved in. Tile over a hearth and surround is a fast change with a big effect, and it carries its own rules about clearance and heat that we follow. The other is the full bathroom. A remodel is a schedule problem as much as a tile problem. Demo, plumbing rough, board, waterproofing, tile, grout, then fixtures back in. Miss the order and somebody waits around for a day. We keep the sequence tight and we tell you which days the room is out, so a house with one full bath can plan around it.

None of this is exotic. It is the ordinary craft of setting tile, done in the order the work actually needs. What makes it rare is patience. A tile contractor racing to the next job will skip the flood test, float the wall by eye, and let the grout hide the rest. That job looks fine for a year. We would rather take the extra half day and be done with it. Our work sits in houses we drive past, in neighborhoods near ours, off Dodge Park and Schoenherr and the streets running back from Van Dyke. Somebody around here will remember your bathroom. That keeps us honest better than any line typed on a website.

Call (586) 250-4239
Green scalloped tile accent wall behind a vanity
How it works

How a tile job runs at your house

01

Your inquiry

Call or send the short form with what is going on at your place. A sentence or two is plenty for the first step.

02

We talk it through

We go over the situation on the phone, ask the questions that matter, and tell you what we would do next.

03

A clear plan

You get a plain-language rundown of the work, the order it happens in, and what to expect on the day.

04

The work gets done

Our crew shows up when we said, does the job, and walks you through the result before leaving.

Marble herringbone backsplash glowing behind a gas range

Tell us about the room and we will tell you what it takes

Tell us what is going on at your Sterling Heights home and we will walk you through the options. One call or one short form is all it takes.

Call (586) 250-4239

Make your inquiry

Looking for help at a Sterling Heights home? Send the short form and we get back fast during open hours: .

Start the form
Frequently asked questions

Questions Sterling Heights families ask

Straight answers first. If yours is not here, call (586) 250-4239 and ask.

Tell us about the room and we will tell you what it takes

Tell us what is going on at your Sterling Heights home and we will walk you through the options. One call or one short form is all it takes.

Call (586) 250-4239

Make your inquiry

Looking for help at a Sterling Heights home? Send the short form and we get back fast during open hours: .

Start the form
CallContact us